NYC Violation
Removal โ Cleared in 3โ7 Days.
You have 75 days from the NOV date before the city files a lien for 2โ3ร the cost. We pull the permit, do the repair to DOT spec, and call in the re-inspection โ start to clear in under a week.
Look at the date stamped on your NOV. After 75 days, the City of New York does the work itself and bills your property at:
Plus a 9%/year lien on your property until paid in full. Sale and refinancing blocked.
Lock in private rateBorough-by-borough. No hidden fees.
| Service Area | Repair $/sqft | DOT Permit | Notes |
|---|---|---|---|
| Brooklyn | $15โ$22 | $215 | Most jobs cleared in 3-5 days |
| Queens | $15โ$22 | $215 | Tree-root jobs common |
| Manhattan | $22โ$28 | $320 | Permit & traffic plan included |
| Bronx | $15โ$21 | $215 | Co-op & multi-family discounts |
| Staten Island | $14โ$20 | $195 | Same-day site visits |
| Nassau County | $13โ$19 | $175 | Town of Hempstead specialty |
| Suffolk County | $13โ$19 | $175 | Driveway aprons included |
From NOV to cleared in under a week.
- 01Inspect
Free same-day on-site assessment. Written fixed-price estimate within 24 hours.
- 02Permit
We pull the DOT sidewalk repair permit in your name. You sign nothing extra.
- 03Repair
Concrete poured to NYC DOT spec โ 4โณ depth, wire mesh, proper expansion joints.
- 04Re-Inspection
We call in the DOT re-inspection. Violation cleared from your property record.
The lien is worse than the violation.
Under NYC Admin Code ยง19-152, after 75 days the DOT contracts the repair itself. The bill โ typically 2โ3ร private rates โ becomes a tax lien on your property at 9% annual interest until paid in full.
Stop the Clock โAll 5 boroughs + Long Island.
Most NYC contractors stop at the city line. We're the only crew covering Nassau and Suffolk County sidewalk work with the same 3โ7 day turnaround.
Passes re-inspection or you don't pay.
Frequently Asked Questions
?What is a DOT sidewalk violation?
The NYC Department of Transportation issues a Notice of Violation (NOV) when an inspector finds defects in the sidewalk fronting your property โ cracks, trip hazards, missing flags, or tree-root displacement. Under NYC Admin Code ยง19-152, the property owner is responsible for repairs.
?How long do I have to fix a sidewalk violation?
You have 75 days from the date stamped on the NOV. After day 75, the city can perform the work itself and file a lien against your property for 2-3ร the private contractor cost.
?How much does sidewalk violation removal cost in NYC?
Most repairs run $15โ$25 per square foot depending on borough, plus a DOT permit ($175โ$320). See our published borough pricing table for exact rates.
?Do I need a permit to repair my own sidewalk?
Yes. Any sidewalk repair in NYC requires a DOT permit even if you do the work yourself. We pull the permit in your name within 24 hours.
?How fast can you clear my violation?
Most jobs are completed in 3โ7 business days from signed estimate to DOT re-inspection. Same-day assessment is included with every free estimate.
?What happens if I ignore the NOV?
After day 75 the NYC DOT performs the work itself, charges 2โ3ร private contractor rates, and files a property lien. The lien blocks refinancing and sale until paid in full plus 9% annual interest.
?Are tree-root sidewalk repairs covered by the city?
Only if the tree was planted by NYC Parks AND you filed a complaint before damage occurred. Otherwise the property owner is liable, even for city-owned trees on the curb strip.
?Do you cover Long Island?
Yes. We handle Nassau and Suffolk County sidewalk violations including Town of Hempstead, Babylon, Islip, and incorporated villages. Most NYC-area competitors only cover the 5 boroughs.
?Do you offer a guarantee?
Yes โ 100% DOT compliance or your money back. If the repair doesn't pass DOT re-inspection on the first call, we fix it free and refund the permit fee.
?Can you remove an existing sidewalk lien?
Yes. We file the lien-removal paperwork after the city-billed work is paid, or we negotiate a contractor buyout. See our dedicated Sidewalk Lien Removal NYC page.
Same-day on-site assessment. No obligation.
Send your NOV number (or just the address) and we'll have a licensed estimator at your property within 24 hours. We pull the DOT permit in your name, repair to spec, and call in the re-inspection โ typically cleared in 3-7 business days.
- โ Free written estimate, fixed price
- โ Permit, repair, and re-inspection handled end-to-end
- โ Lien removed if violation is past day 75
estimates@nycviolationremoval.com